SPELEEM ENERGY ANALYZER HV RAMPING
The following conditioning procedure is to be followed only after venting and bake-out.
- Insert the analyzer grid ( pos. 10mm on the linear drive)!
- All potentiometers in analyzer unit turned to ZERO
- HV ramp up to 18kV:
- from 0-5kV: slowly in one run in 5mins
- from 5-12kV: 1 kV steps every 15 mins
- from 12-18kV: 0.5kV steps every 15 mins
In case of breakdowns wait longer.
- Having the 18kV you can run the analyzer's electrodes simultanously:
- Bias 200V steps in 10 mins (4x) = 800V
- Ret.L (L1) 1.5kV steps in 10 mins (4x) = 6.000V
- inner L (L2) 1kV steps in 10 mins (4x) = 4.000V
- Acc, L 500V steps in 10 mins (4x) = 2.000V
Total time about 6 hours.
|